TN River is shutdown at river mile 411 while TVA resumes operations on Monday, June 13, 2022 to replace the transmission line after the old one was cut. Beginning Monday, June 13 through Wednesday June 15, the river will completely shut down during daylight hours only. Three boats will occupy the water to warn boaters to keep out; two boats will have will have white/yellow flashing lights, TVA Police will operate the third boat with blue lights.