Heavy concrete shell placement at Kentucky Lock not taken lightly
Barney Schulte, technical engineer for Kentucky Lock Addition Project, checks specifications for the gantry crane lift system in preparation for the movement of a 1.3 million pound concrete shell Aug. 4, 2018 into the downstream riverbed to form a cofferdam. The shell will also be part of the permanent lock wall.