Hydropower model tests generate positive results for Center Hill rehab project
Tai Do (Left), Voith Hydro Hydraulic Laboratory manager, answers questions about an ongoing test of a turbine with Jamie James (Right), U.S. Army Corps of Engineers Nashville District Hydropower Rehabilitation Program manager, at the laboratory in York, Pa., Oct. 8, 2014. Flavio Spadotto (Center), Voith Hydro project manager, also provided input. James is part of a team that visited the lab to ensure the turbine meets required specifications before the manufacturing process and work to modernize the power house begins at Center Hill Dam in Lancaster, Tenn.