Nashville District completes Wolf Creek Dam barrier wall
John Schnebelen (Right), U.S. Army Corps of Engineers Nashville District safety officer for the Wolf Creek Dam Foundation Remediation Project, monitors operations on the work platform March 6, 2013 as Brian Redman, Treviicos-Soletanche Joint Venture, works to place concrete in the last of 1,197 piles that make up the barrier wall deep into the dam's foundation in the 4,000-foot long embankment. (USACE photo by Lee Roberts)

Download Image: Full Size (6.79 MB)
Tags:
Photo by: Lee Roberts |  VIRIN: 130306-A-EO110-003.JPG