District Digest News Stories

Results:
Tag: Caney Fork River
Clear
  • November

    Center Hill Dam featured in National Inventory of Dams rollout

    LANCASTER, Tenn. (Nov. 5, 2021) – The National Inventory of Dams is being updated at the end of the year and the U.S. Army Corps of Engineers plans to feature Center Hill Dam in a video as part of its rollout with the public.
  • April

    First responders coordinate actions in Center Hill Dam tabletop exercise

    LANCASTER, Tenn. (April 15, 2019) – First responders participated in an exercise at Center Hill Dam last week to coordinate actions that would be necessary if they had to respond to a scenario where the U.S. Army Corps of Engineers Nashville District could not operate the spillways during a high water event.
  • December

    Video highlights water management in Cumberland River Basin

    NASHVILLE, Tenn. (Dec. 10, 2020) – The public is invited to watch a newly released video that highlights how water is managed in the Cumberland River Basin in support of flood risk management, commercial navigation, hydropower production, water supply, environmental stewardship, and recreational opportunities.
  • May

    Center Hill Recreation Area opens today

    LANCASTER, Tenn. (May 8, 2020) — The U.S. Army Corps of Engineers Nashville District announces that Center Hill Recreation Area, located adjacent to Center Hill Dam, is once again opening for public use beginning Friday, May 8, 2020.  Center Hill Recreation Area has been closed since 2008 as a result of construction activities related to the Center Hill Dam Rehabilitation Project.
  • April

    Concrete placement rolling along at Center Hill’s auxiliary saddle dam

    LANCASTER, Tenn. (April 18, 2019) – The U.S. Army Corps of Engineers recently began placing “roller-compacted concrete” to build a reinforcing berm downstream of Center Hill’s auxiliary dam. This construction is the final major risk-reduction contract in the ongoing Center Hill Dam Safety Rehabilitation Project.
  • November

    Next construction phase gets rolling at Center Hill’s auxiliary dam

    SILVER POINT, Tenn. (Nov. 30, 2018) – The U.S. Army Corps of Engineers Nashville District and contractor Thalle Construction Company are moving towards the conclusion of the Center Hill Dam Safety Rehabilitation Project.
  • September

    Toy provides workforce readiness overview during Nashville District visit

    NASHVILLE, Tenn. (Sept. 28, 2018) – The commander of the U.S. Army Corps of Engineers Great Lakes and Ohio River Division gave a general overview of command philosophies and the Workforce Readiness Program during a visit this week to the Nashville District.
  • February

    Nashville District holds high water tabletop exercise

    NASHVILLE, Tenn. (Feb. 27, 2018) – The U.S. Army Corps of Engineers Nashville District Crisis Management Team held a water management tabletop exercise today to walk through a simulated high-water event within the Cumberland River Basin in Middle Tennessee.
  • November

    Center Hill Lake levels to remain lowered for spillway gate study

    NASHVILLE, Tenn. (Nov. 9, 2017) — The U.S. Army Corps of Engineers Nashville District announces Center Hill lake levels will remain lowered and targeted at elevation 630 mean sea level for 2018, and will likely remain at that level several more years until recently identified main dam spillway gate issues can be fully evaluated.
  • September

    Tennessee Crossroads to feature Dale Hollow Dam’s story

    CELINA, Tenn. (Sept. 13, 2017) – Where do you go when you want to learn about the unique and exiting places in Tennessee? Well the Tennessee Crossroads television program of course! And where does the Tennessee Crossroads staff go to learn about sustainable power and endless recreational opportunities? No place other than here at Dale Hollow Dam and Lake!
  • June

    Crew installs 249-ton hydropower rotor at Center Hill Dam

    LANCASTER, Tenn. (June 19, 2017) – A work crew installed a 249-ton hydropower rotor today at Center Hill Dam, culminating weeks of safety preparations to lift and maneuver the heavy load into position to generate hydroelectricity.
  • March

    Get ready to recreate in Cumberland River Basin

    NASHVILLE, Tenn. (March 13, 2017) – The U.S. Army Corps of Engineers Nashville District’s 146 recreation areas, 25 developed campgrounds and primitive camping areas in Kentucky and Tennessee remain quiet, empty and closed, but that all changes this week.
  • February

    Real Estate team lauded for groundbreaking land exchange process

    NASHVILLE, Tenn. (Feb. 24, 2017) -- The “Center Hill Land Exchange Real Estate Delivery Team” recently received a team achievement award for its groundbreaking land exchange process from the U.S. Army Corps of Engineers Great Lakes and Ohio River Division.
  • March

    Jackson gets general overview of Nashville District construction projects

    NASHVILLE, Tenn. (March 31, 2016) – The U.S. Army Corps of Engineers deputy commanding general for Civil and Emergency Operations visited a Nashville District project for the first time to interact with project managers and engineers.
  • February

    Come see what a Nashville District lake has to offer this summer

    NASHVILLE, Tenn. (Feb. 1, 2016) – In just a few months it will be time to get wet, sunbathe, fish, hike, camp and go boating at a U.S. Army Corps of Engineers Nashville District lake. Vacationers and locals alike are encouraged to come see what the 10 lakes in the Cumberland River Basin have to offer this summer.
  • October

    Center Hill historical marker dedicated

    LANCASTER, Tenn. (Oct. 27, 2015) – Local community leaders and Corps officials dedicated a new Tennessee state historical marker today that highlights the technical significance of Center Hill Dam and Powerhouse and the project’s authorized purposes, which include recreation, hydropower, and flood risk reduction.
  • Turbine lifted to rehabilitate hydropower unit at Center Hill Dam

    LANCASTER, Tenn. (Oct. 7, 2015) – Work crews lifted a turbine out of hydropower unit two at Center Hill Dam today, one of the final pieces of the disassembly process. It is the first time the 82-ton steel wheel has seen the light of day since its installation in 1950, a rare sight that makes it possible to inspect, rebuild embedded parts, and then reassemble the unit with new components.
  • September

    Corps begins hydropower rehabilitation at Center Hill Dam

    LANCASTER, Tenn. (Sept. 9, 2015) – Disassembly of hydropower unit two is about to get underway at Center Hill Dam, which is the first of 28 units in the Cumberland River Basin to be rehabilitated as a result of a Memorandum of Agreement with the Southeastern Power Administration and power customers signed in August 2011 that provided a funding stream for the work.
  • October

    Hydropower model tests generate positive results for Center Hill rehab project

    YORK, Pa. (Oct. 10, 2014) – Corps experts witnessed a series of tests this week on a “small-scale” turbine model in a laboratory at Voith Hydro Inc. The tests were completely successful and the positive results will keep the Center Hill Hydropower Rehabilitation Project schedule on track.
  • April

    Great lakeside camping awaits visitors at Corps campgrounds in 2014

    NASHVILLE, Tenn. (April 8, 2014) – People who love fresh air and enjoy beautiful lakeside views should make time this year to stay at one of the 25 campgrounds nestled along the Cumberland River and its tributaries that are operated by the U.S. Army Corps of Engineers Nashville District.