Turbine-generators replaced at Center Hill Hydropower Plant
The U.S. Army Corps of Engineers Nashville District and contractors from Voith Hydro installed a 249-ton hydropower rotor on June 19, 2017, at Center Hill Dam in Lancaster, Tennessee.

Download Image: Full Size (1.11 MB)
Photo by: USACE Photo |  VIRIN: 170619-A-A1409-0011.JPG