Cheatham Lock scheduled to reopen after major maintenance repairs
Terry Farrow, electrician, U.S. Army Corps of Engineers Nashville District, welds a metal “flag” for the lower river wall valve limit at Cheatham Lock, Ashland City, Tenn., Nov. 13, 2012. The lock is scheduled to reopen at 6 p.m., Nov. 15, 2012 after a one-month closure to permit major maintenance repairs to hydraulic and mechanical equipment damaged during the 2010 flood along with other routine maintenance. (USACE photo by Fred Tucker)

Download Image: Full Size (7.73 MB)
Tags:
Photo by: Fred Tucker |  VIRIN: 121113-A-HL948-008.JPG