Cheatham Lock scheduled to reopen after major maintenance repairs
Left to right, Greg Cox, chief of maintenance section, and Jimmy Reeves, mechanic, U.S. Army Corps of Engineers Nashville District insert the new cylinder into the rack on the upper river wall valve machinery at Cheatham Lock Nov. 13, 2012. Upper river valves fill the lock chamber to lake level and lower river valves lower it to tailwater level. (USACE photo by Fred Tucker)

Download Image: Full Size (7.11 MB)
Tags:
Photo by: Fred Tucker |  VIRIN: 121113-A-HL948-005.JPG